What is calendar runway?
Calendar runway is the free working time actually left in your diary before a deadline, compared with the effort the work still needs. “Due in 11 days” says how far away something is; runway says whether there is room to do it.
A worked example
Sam Ellis, who runs sales at Meridian Systems (a fictional company), owes Northstar a commissioning report. It is Monday morning, and the report is due on Friday week.
| Days until the deadline | 11 |
| Working days among them | 10 |
| Working hours in those days (09:00–17:30) | 85 hours |
| Free time left once the meetings are counted | 3.5 hours, in 3 gaps — plus 1 twenty-minute gap that is too short to count |
| What Sam estimates the report needs | 6 hours |
| Runway | 3.5 hours free for 6 hours of work: insufficient |
Radar puts the reason on the report — “Insufficient runway: 3.5h free for 6.0h of work” — and counts it towards the report’s risk, so it stands out on the radar while it is still 11 days out. On a plain task list it would still look comfortable for another week.
Why days remaining misleads
Days remaining treats every day as empty. Most working weeks are not: meetings, travel and the work already promised to other people take most of them, and what is left arrives in scraps. Eleven days with three and a half free hours is a different job from eleven empty days, and the difference only shows up when the diary is in the sum.
How Radar works it out
- Free time is your working hours (09:00–17:30, Monday to Friday) up to the end of the deadline day, less every busy event in your connected calendars. Events marked free or working elsewhere, and all-day events, do not count as busy.
- Gaps shorter than 30 minutes are ignored: nobody writes a report in twenty minutes between calls. A gap of an hour or more counts as a work window, and Radar warns when only one is left.
- The estimate is yours. You say how many hours the work needs when you put it on your Radar, and as you record progress Radar counts only what is left: 6 hours at 50% done is 3 hours still to find.
- Correcting it is editing the estimate or the progress. Radar never changes either on its own.
- The verdict: less free time than the work needs is insufficient; less than a quarter more than it needs is tight; anything else has room. Runway is worked out for the next 45 days, where the calendar is still a fair picture of the week.
- It never books time for you. Radar can suggest blocks to reserve, and puts one in your calendar only when you press the button.
Which calendars it counts
Runway needs a connected calendar. Without one, Radar can only show how many days are left. It counts every calendar you connect:
| Calendar | Status |
|---|---|
| Microsoft 365 and Outlook.com calendar | beta |
| Google Calendar | verified against a real account, 20 Sep 2026 |
| A published calendar feed (ICS) | verified against a real account, 23 Sep 2026 |
Hiding a calendar from the calendar screen does not remove it from runway: a meeting you would rather not look at still takes the hour.
Who else does this
Comparing the effort a job needs with the time available is an old idea — it is what capacity planning in project tools has always done. Calendar planners such as Motion and Reclaim go a step further and schedule the work into your diary for you. Radar does something narrower: it measures whether the time exists before the deadline, for everything you are carrying, and tells you weeks ahead when it does not. It does not move anything.